Production Lead Time & Scheduling

At Obibi, we understand that in the fast-paced world of baby products, timing is everything. Our comprehensive lead time management system is designed to provide transparency, reliability, and flexibility throughout your manufacturing journey. This page details our standard production timelines, scheduling processes, and the factors that influence delivery dates.

With over a decade of experience as a professional baby clothing manufacturer, we've optimized our production workflows to balance speed with quality. Our advanced planning systems, coupled with flexible manufacturing capabilities, allow us to accommodate everything from urgent small batches to complex large-volume orders while maintaining our unwavering commitment to quality standards.

Below you'll find detailed information about our standard lead times, expedited options, and the collaborative approach we take to ensure your products reach the market at the perfect moment.

Standard Production Lead Times

Our standard lead times are calculated from the date of final approval and deposit receipt to the date of goods readiness for shipment.

1

Basic Baby Clothing Items

25-35 Days

  • Onesies, bodysuits, and basic rompers
  • Simple pants and tops
  • Basic accessories (bib sets, hats)
  • Standard fabric with minimal customization
2

Complex Garments & Multi-piece Sets

35-45 Days

  • Outerwear (jackets, coats)
  • Multi-piece gift sets
  • Garments with complex construction
  • Items requiring special finishes
3

Custom Developed Products

45-60 Days

  • New product development
  • Custom fabric creation
  • Complex embroidery or printing
  • Products requiring new tooling
4

Large Volume Orders (10,000+ units)

50-70 Days

  • Mass production runs
  • Multiple size and color variations
  • Complex packaging requirements
  • Multiple quality checkpoints

Detailed Production Timeline Breakdown

Understanding each phase of our manufacturing process helps in accurate planning and expectation management.

Order Confirmation & Planning

1-2 Days

  • Order review and technical analysis
  • Production scheduling
  • Material requirement planning
  • Team assignment and resource allocation

Material Procurement

3-7 Days

  • Fabric and trim sourcing
  • Quality testing of incoming materials
  • Custom material production (if required)
  • Material warehouse preparation

Production Preparation

1-2 Days

  • Pattern making and grading
  • Production sample approval
  • Machine setup and calibration
  • Production line organization

Cutting Process

2-5 Days

  • Fabric spreading and alignment
  • Computerized pattern cutting
  • Piece sorting and bundling
  • Quality inspection of cut pieces

Sewing & Assembly

10-25 Days

  • Garment assembly line production
  • Embroidery and printing processes
  • In-process quality checks
  • Component attachment (buttons, zippers)

Finishing & Quality Control

3-10 Days

  • Ironing and pressing
  • Final quality inspection (AQL standards)
  • Measurement verification
  • Defect correction and rework

Packaging & Labeling

2-4 Days

  • Final folding and presentation
  • Private label application
  • Polybagging and boxing
  • Carton preparation and labeling

Shipping Preparation

2-4 Days

  • Final quantity verification
  • Shipping document preparation
  • Customs documentation
  • Loading container arrangement

Quality Audit & Release

1-2 Days

  • Final random quality audit
  • Certificate of compliance issuance
  • Client notification of completion
  • Warehouse release for shipment

Key Factors Influencing Production Time

Order Complexity

  • Design Complexity: Simple vs. intricate designs
  • Number of Components: Multiple pieces per garment
  • Size Range: Number of sizes in the order
  • Color Variations: Multiple color options
  • Special Features: Embroidery, printing, or special finishes

Material Availability

  • Stock Materials: Immediate availability
  • Custom Fabrics: Additional production time
  • Import Requirements: International sourcing delays
  • Quality Testing: Material certification process
  • Seasonal Demand: Peak season material shortages

Customization Level

  • Private Labeling: Custom tags and packaging
  • Special Packaging: Custom boxes or polybags
  • Technical Development: New pattern creation
  • Sample Approvals: Multiple revision rounds
  • Special Certifications: Additional testing requirements

Expedited Production Services

For urgent requirements, we offer expedited production options with additional charges based on the required acceleration.

Service Level Time Reduction Surcharge Best For
Standard 0% No additional charge Regular planning cycles
Express 20-30% faster 15-25% additional Urgent replenishment orders
Priority 40-50% faster 30-40% additional Time-sensitive launches
Emergency 60%+ faster 50%+ additional Critical stock emergencies

Important Notes:

  • Expedited services subject to factory capacity availability
  • Additional charges vary based on order complexity and current workload
  • Minimum order quantities may apply for expedited services
  • Quality standards remain unchanged regardless of production speed

Production Planning & Scheduling Tools

Real-Time Production Scheduling

We provide clients with access to our production scheduling system, offering real-time visibility into your order status and factory capacity.

  • Online Order Tracking: Real-time progress updates
  • Capacity Calendar: View available production slots
  • Milestone Notifications: Automated status updates
  • Document Portal: Access to production documents
  • Planning Consultation: Strategic production planning sessions

Our production planning team works closely with you to optimize scheduling based on your market needs, seasonal demands, and inventory requirements.

Seasonal Production Planning Guide

Proactive planning helps avoid peak season delays and ensures timely delivery for your important selling seasons.

Spring/Summer Collections

  • Ideal Order Date: October - December
  • Production Period: January - March
  • Delivery Target: March - April
  • Peak Capacity: February - March

Fall/Winter Collections

  • Ideal Order Date: April - June
  • Production Period: July - September
  • Delivery Target: September - October
  • Peak Capacity: August - September

Holiday Collections

  • Ideal Order Date: June - July
  • Production Period: August - October
  • Delivery Target: October - November
  • Critical Deadline: September 30th

Optimizing Your Production Timeline

Early Planning

Initiate discussions 3-4 months before your required delivery date to secure optimal production slots.

Clear Specifications

Provide complete technical packs and clear requirements to minimize back-and-forth communication.

Material Selection

Choose from our stock fabric options or plan custom material development well in advance.

Sample Approval

Respond promptly to sample submissions to keep the production schedule on track.

Flexible Scheduling

Consider production during off-peak seasons for potentially faster turnaround times.

Regular Communication

Maintain open communication with your dedicated account manager for proactive issue resolution.

Get Your Custom Production Timeline

Every order is unique. Contact our production planning team to receive a detailed, customized lead time estimate for your specific project requirements.

Production Planning Department

Email: [email protected]

Lead Time Inquiries: [email protected]

Tel: tel

Expedited Service Requests

For urgent production requirements, please contact our emergency planning line:

Urgent Requests: [email protected]

Response Time: Within 4 business hours

Ready to Start Your Production Journey?

Submit your project details and receive a comprehensive production timeline within 24 hours.

Request Production Quote